Lighting Project Of Goldasht Overpass

Erfan Sanat Isfahan Company designed and implemented the lighting project of Goldasht overpass in order to increase the beauty of the city sights. Proper lighting of the overpasses, in addition to beautifying and improving the night view of the city, psychologically motivates pedestrians to cross these passages.

The lighting of the overpasses makes the advertisements installed on these passages more attractive and effective.

Project Description

According to the specifications of the bridge, various designs can be created and implemented to implement the overpass lighting project. For this goal, at the first the length of the overpass and its height must be determined. In the next step, the metal structure is placed on the overpass by lifting.

The strings are installed on the stands by tow wires. The number of strings that are used in Goldasht overpass lighting projects depends on the length of the overpass. In the lighting project of Goldasht Municipality overpass, 30 strings have been used with Self-contained box, 20 of which are 6 meters and 10 of which are 10 meters. By connecting all the strings to the city’s electricity, They will start working at the same time.

Project goals

The project is used to beautify the urban space, attract the air bridge the overpass and advertising. It can be used to create great day and night views on the way. Lighting of overpass, the design and creation of which is appropriate to the principles and criteria of urban landscape. Psychologically, it will motivate passers.

Components and content

  • Piers 10 * 10 = 6 meters and 9 meters
  • Self-contained box Full-color oak string 10 meters 20 bulbs 10 pcs
  • Self-contained box Full-color oak string 6 meter 20 bulbs 20 pieces
  • 2 remote controls
  • Tow wire
  • Crepe

Executive organizations

In order to illuminate and implement overpass, first the metal structures must be prepared and painted, then with the use of lifter and welding specialists, the metal structures must be installed on the overpass. In the next step, connect the strings to the installed piers by tow wire and a crepe. Eventually, all the strings are connected to the city’s electricity.

Time schedule

Depending on the length of the bridge and the number of strings, it can be completed in 1 to 3 days.