Erfan Sanat Isfahan Company designed and implemented the lighting project of Baghistan overpass in order to increase the beauty of the city sights. Proper lighting of the overpasses, in addition to beautifying and improving the night view of the city, psychologically motivates pedestrians to cross these passages.

The lighting of the overpasses makes the advertisements installed on these passages more attractive and effective.

In the lighting project of Baghistan  municipality overpass 32 strings have been used which are connected to each other with two central 16 output boxes.

Project Description

According to the specifications of the bridge, various designs can be created and implemented to implement the overpass lighting project. For this goal, at the first the length of the overpass and its height must be determined. In the next step, the metal structure is placed on the overpass by lifting.

The strings are installed on the stands by tow wires. The number of strings that are used in Baghistan overpass lighting projects depends on the length of the overpass

Project goals

The project is used to beautify the urban space, attract the air bridge the overpass and advertising. It can be used to create great day and night views on the way. Lighting of overpass, the design and creation of which is appropriate to the principles and criteria of urban landscape. Psychologically, it will motivate passers.

Components and content

  • Piers 10 * 10 = 6 meters 2 piecesand 9 meters 2 pieces
  • Full color oak string lights 6 meters 20 pieces
  • Full color oak string lights 10 meter 12 pieces
  • Central box 16 flame output 2 pcs
  •  remote controls 2 pcs
  • Tow wire 9 meters
  • Crepe

Executive organizations

In order to illuminate and implement overpass, first the metal structures must be prepared and painted, then with the use of lifter and welding specialists, the metal structures must be installed on the overpass. In the next step, connect the strings to the installed piers by tow wire and a crepe. The string cables are connected to the central box and the boxes are networked together.

Time schedule

Depending on the length of the bridge and the number of strings, it can be completed in 1 to 3 days.